SHANE GINGRASS
shane@gingrass.com

784 Lingerlost Road
Killen, AL 35645
Home (251) 219-4579
Cell (256) 520-4436

PROFESSIONAL PROFILE

Scheduling    •    Project Management    •    Planning


Focused professional with a notable track record of success in work planning, quality inspection, engineering, scheduling and capital project management within high-pressure environments. Proven results adhering to strict scheduling requirements and coordinating detailed vendor work, on and off sight. Expert use and knowledge of Primavera P3/P3e (own a licensed copy of P3). Able to develop databases for component maintenance programs, tracking/trending, failure and root cause analysis. Highly proficient in use of MS Excel, Access, Word and Oracle. Experienced writing lesson plans and performing walkdowns. Thorough understanding of nuclear / non-nuclear electrical installations. Currently obtaining PMP certification, from PMI. Core Competencies include:

Engineering
Project Scope Determination
Work Document Review
Integrated Cost Scheduling
Change Control

Time Impact Analysis
Construction Management
Develop OBS/WBS Dictionaries
Primavera P3 / P3e/c

Critical Path Method (CPM)
Estimate at Completion
Life Cycle Scheduling
Capital Project Management
Closeout Documentation

EXPERIENCE

SENIOR SCHEDULER - Lucent Technologies    4/05 - 1/06
Hyperion Consulting - Baghdad Iraq A

→Produced and maintained cost and resource loaded schedules (P3e)
,for 6 task orders  associated with
    the Advanced First Responder Network (AFRN).
→Provided Earned Value information for monthly reports to the Project Controls office (PCO).
→Conducted weekly schedule update meetings for project managers and sub-contractors.
→All said work was performed within hardship zones in Baghdad, Iraq.

SENIOR SCHEDULING CONSULTANT - US Army Corps of Engineers    8/04 - 4/05
Carter Safety Consultants - Hunstville, AL A

Tracked and Trended Schedules and Costs for Project Managers and Customers A
→Mentored U.S. Government employees and contractors for the use of the Corps of Engineers project     management application (P2).
→P2 utilized Primavera P3e, Oracle Databases, and Corps of Engineers financial management software,
    as a sole source for project management.

SENIOR CONFIGURATION MANAGER - Colinial Pipeline    4/04 - 07/04
Marathon Consulting Group – Alpharetta, GA A
Telecommunication position for a 5500 mile oil and gas pipeline stretching from Texas to New York. A
→Selected, installed and implemented a comprehensive Computer Maintenance Management System
    (EMaint®).
→Installation and front loading of CMMS.
→Created and applied logical equipment naming convention.
→Loaded CMMS with equipment ID's Procedures, Maintenance Tasks and Parts information.
→Created comprehensive schedule for booster station maintenance.

SENIOR PREVENTATIVE MAINTENANCE ANAYLYST - Nine Mile Point   10/03 - 4/04
Marathon Consulting Group – Oswego, NY A
→Performed PM Optimization (PMO) of existing PM tasks aligning with IMPO AP-913 methodology.
→Critical Component Scoping and Identification in support of INPO AP-913 per INO 1007935 and
    considered  all PM activities for applicability at the component level.
→Applied Constellation PM templates, developed for fleet standardization.
→Resolved feedback and implementation issues created by the PM Optimization.
→Participated in the Constellation Equipment Reliability Improvement Program (ERIP) though analysis
    of current practices, past practices and industry standards, to improve equipment reliability in
    targeted areas.
→Created an extensive recovery Preventative Maintenance Optimization Plan for Nine Mile Point Units
    (1) and (2) inverters / battery chargers.

SENIOR PREDICTIVE MAINTENANCE ANAYLYST - Calvert Cliffs Nuclear Station  7/03 - 8/03
Marathon Consulting Group – Lusby, MD A
Performed PdM Assessment of existing predictive maintenance technologies in compliance with INPO
    AP-913 methodology.
Responsibility encompassed Motors, Motor Operated Valves and Air Operated Valves.
Considered all predictive technologies for applicability at the component level.
Participated in Constellation's PdM standardization efforts and peer meetings to standardize
    technologies.
Contributed to Motor Testing, AOV Testing, MOV Testing and Circuit Breaker Predictive Technology
    standardization meetings.
Deliverable equaled, Constellation Standard to be used fleet-wide prescribing PdM technologies for
    mentioned components.
Created, maintained and published project schedule in MS Project.

PROJECT MANAGER - Kewaunee Nuclear Plant  1/03 - 6/03
Famatome ANP – Kewaunee, WI A
→Removed, replaced and returned to service Westinghouse model 93A Reactor Coolant Pump Motor
    (RCPM).
RCP pump, motor and Oil Spillage Collection (OSPS LOCS) replacement coordination and scheduling.
Qualified Contractor Liaison


COMPONENT ENGINEERING (Electric Motors)     5/99 – 6/03
SYSTEM ENGINEERING (120/208VAC0)
MAINTENANCE SUPPORT ENGINEER
(Electrical Systems)
PROJECT MANAGER (RCP Motor Refurbishment)

Nuclear Management Company,,Point Beach Nuclear Plant, Kewaunee Nuclear Power Plant with Allied Technical, contracted to Duke Engineering and Services (later Framatome ANP).  Two Rivers, WI
Implemented a comprehensive motor maintenance program, utilizing Condition monitoring, (Oil,
    Vibration, Current) Reliability Centered Maintenance Techniques (RCM) industry EPRI/NMAC
    recommendations and classified equipment compliant to INPO AP-913 guidelines.
Analyzed PdMA MCE 3000 Motor Circuit Data.
Initiated purchase of a PdMA Emax "live motor tester", developed trending databases parallel
    with RCM program.
Initiated Disposition Condition Reports and Operating Experiences.
Coordinated new purchases and work with multiple vendors.
Supervised vendors and in-house craft labor, during motor re-builds.
Coordinated a $12M capital project effort to re-manufacture 5 Westinghouse 6000 HP model 93
    Reactor Coolant Pump Motors.
Created and maintained cycle, outage and job specific schedules using Primavera P3.
Assigned System Engineer duties (4/2000) of the 120/208 VAC.
Published in third quarter 2001 "Nuclear Professional" for troubleshooting techniques.


SENIOR RELIABILITY CENTERED MAINTENANCE ANAYLYST - Calvert Cliffs Nuclear Station    7/03 - 8/03
Marathon Consulting Group – Clinton, IL A
Analyzed and implemented predictive and preventative maintenance tasks and frequencies (full scale
    PM Optimization effort), initiating preventative maintenance and programmatic changes to existing
    programs, recommending tasks for deletion, extension and/or revision.


COMPONENT ENGINEER/PROJECT MANAGER - Point Beach Nuclear Plant 12/97 - 8/98
Contract Solutions - Two Rivers, WI A
Responsible for all Electric Motors, Hoist and CranesA
Created a comprehensive Motor Maintenance Program, utilizing oil, vibration and current condition
    monitoring; reliability centered maintenance techniques (RCM); and EPRI/NMAC recommendations.
Created and maintained cycle, outage and job specific schedules using Primavera P3.
Initiated the purchase of a PdMA MCE 3000 Motor Circuit Analyzer.
Developed trending databases parallel to the RCM Program.
Coordinated new purchases and outside work with numerous vendors.
Supervised in-house craft labor during motor re-builds.
Prepared 10CFR50.59 screenings.
Attended PdMA Users' Conference and Performance Improvement International’s Root Cause
    Analysis  Training.

ELECTRICAL PLANNER/PROCEDURE WRITER - River Bent Station 8/95 - 10/97
Volt Technical Services - St. Francisville, LAA
Responsible for all Electric Motors, Hoist and CranesA
Created upgraded and analyzed electrical preventive and predictive work orders and procedures.
Coordinated activities with Reliability Centered Maintenance Program staff, System Engineering and
    Craft personnel to produce technically correct / user-friendly procedures and schedules.
 Accountable for electrical distribution, auxiliary relays, motors and MOV's.


ADDITIONAL EXPERIENCE 5/95 - 10/90
MOV Actuator Instructor (1993) - Wrote and instructed a motor-operated valve course to prepare
    students or MOV outage work. Students were Institute of Nuclear Power Operations (INPO) certified,
    upon completion.
Performed work for electrical and mechanical work packages on LIMOTORQUE, ROTORK, EIM  valve
    actuators

CERTIFICATIONS / PROFESSIONAL AFFILIATIONS
ANSI/ASME N45.2.6-1978 Level III
ANSI/ANS 3.1-1978, 4.6-1978, 4.3.4 and 3.1-1987, 4.4.6 and 3.1-1987 and 4.5.3.3
PdMA Corporation MCE Analyst
PdMA Corporation EMAX Analyst
Infraspection Institute Level 1 Thermography

 

EDUCATION / TRAINING
Managing Project Data in Primavera P3 & P3e
Resource and Cost Analysis for Primavera P3& P3e
Planning and Scheduling, Primavera P3 & P3e
Programmable Controllers, Rotork, Limitorque, EIM, MOV's